Facilities and
Safety Coordinator, Lakos- Fresno,
CA
03/ 2013 – Present
·
Oversee
Maintenance Personnel.
·
Facilitated
a preventive maintenance program.
·
Completed
the Hazardous Material Business Plan.
·
Monitor
Storm Water, take samples for analysis and repot findings to the state Water
Board.
·
Wrote all
Safety Programs and perform monthly Safety Training meetings for all
employees.
·
Perform
accident investigations.
·
Perform
monthly Plant Safety Audits and Fire Extinguisher inspections.
·
Maintain
the plans for fire evacuation and disaster response program
·
Coordinate
the Environmental Health and Safety Program.
·
Maintain a
complete and up to date employee right to know program
Maintenance
Supervisor, JM Eagle- Visalia,
CA
03/2010- 03/2013
·
Oversaw
maintenance personnel and change over team
·
Assured
safety and environmental standards are met
·
Supervised
maintenance personnel in the installation, servicing, and repair of all
machinery
·
Scheduled
all preventive maintenance
·
Responsible
for rebuilding and redesign of equipment
·
Maintained
proper staffing levels
Environmental
Health and Safety Contractor, Baltimore Air
Coil- Madera,
CA
04/2009-03/2010
·
Contract
work through Randstad
·
Compiled
internal documentation for completion of local, state and federal reporting
of hazardous materials and hazardous wastes
·
Managed the
disposition of hazardous materials and waste from vendors (Materials) to
disposal (Waste)
·
Responsible
of gathering samples, transporting to lab and reading lab results
·
Based on
analysis of lab reports, generated safety training guides for employees
·
Facilitated
the generation of satellite collection areas within the plant
·
Responsible
for movement of hazardous waste container to the Hazmat Shed
Plant Manager,
Prinsco Inc.- Fresno,
CA
8/2008-03/2009
·
Oversaw
start up and operational development of new manufacturing and distribution
facility
·
Key tasks
were communicating and working closely with the city for the procurement of
both facility and business licenses and permits
·
Acquisitioned
and installed manufacturing machinery
·
Strategically
planned the plant’s layout for optimum work flow and safety measures
·
Worked
alongside the engineering team to install new machines and have them
operating
·
Created
design and installation of equipment for the Q C Department. Configure Layout
for the inventory yard
·
Recruited
personnel, interviewed, and hired office staff, manufacturing department,
maintenance and transportation personnel
·
Trained
Personnel
·
Oversaw
training in DOT, OSHA and EPA rules and regulations
·
Trained
manufacturing staff in operation of computerized extrusion, equipment
·
Forklift
training and certification
·
Responsible
for production scheduling and reporting, quality assurance, payroll, finance,
quality control, material management, and vendor procurement
Extrusion
Manager, Jain Irrigation- Fresno,
CA
01/2006-07/2008
·
Oversaw
performance management initiatives and reengineering efforts such as
competency-based assessment of extrusion department for 30 to 54
employees
·
Successfully
launched key departmental operation procedures, thus, obtaining a higher
level of on time job order completions (40% to 99.9%), from within a 3 month
period
·
Established
the Extrusion Tooling Department resulting in increased line efficiency,
decreased downtime, consolidation of multiple line equipment and expedition
of changeovers, and tool tracking
·
Facilitated
Process Improvement Methodologies
·
Achieved
increased line utilization from 58% to 90%
·
Responsible
for production scheduling and material planning for all U.S. Facilities
Production
Supervisor, Euro Drip- Madera, CA
05/2005-01/2006
·
Responsible
for a 12 person production crew
·
Facilitated
quality assurance of product, set up and maintained 5 high-speed extruders
·
Developed
and cross trained a highly skilled crew
Production
Manager, Pick-N-Pull- Fresno,
CA
2003-2005
·
Site Safety
and Environmental Coordinator responsible for 3 Lead and 12 Production people
·
Hired,
trained and developed production personnel
·
Production
scheduling to meet daily and monthly production and sales goals
·
Transportation
scheduling for hazardous waste removal
Research and
Development, Wade Rain- Fresno,
CA
2001-2002
·
Facilitated
operational changes to upgrade the extrusion
department
·
Formulated
and developed new products and material testing
Production
Supervisor, Netafim USA- Fresno, CA
1995- 2001
·
Supervised
a 12-person production crew
·
Wrote and
presented Employee Performance Evaluations
·
Implemented
employee training and certification of ISO 9001
·
Facilitated
the Statistical Process Control Program
·
Wrote
procedures and work instruction for machines operation, material and
component transfer and documentation
·
Over saw
the operation of 15 high speed extruders
·
Trouble
shot and maintained: extruders, vacuum systems, centrifugal and vibrating
bowl feeders, drilling units, photo electric fiber optic sensors, resin
systems and blenders
Certified ISO
9001:2000 Interpretation Trainer
Certified
Statistical Process Control
Certified
Forklift and Front end Loader Operator
Certified
Crusher Operator
Certificate of
completion Material Requirements Planning
Certified
Worker Occupational Safety and Health Specialist